Merritt Capital Business Park New Construction
SITE PLAN Merritt Capital Business Park Wake Forest, NC 27587
MERRITT CAPITAL BUSINESS PARK CONCEPTUAL SITE PLAN EXISTING BUILDINGS 740 Merritt Capital Drive 744 Merritt Capital Drive PHASE III 1800 Industry Oaks Lane 63,900 SF 1808 Industry Oaks Lane 72,000 SF
85,800 SF 30,000 SF 84,400 SF 55,200 SF 255,400 SF
1816 Industry Oaks Lane
67,600 SF
741 Merritt Capital Drive 745 Merritt Capital Drive
TOTAL
255,400
TOTAL
LIGHT INDUSTRIAL
SMALL-BAY WAREHOUSES
To Downtown
Wake Forest
90’ 100’
1800
Truck Court
710’
108’
Ligon Mill Road
1808
720’
Truck Court
744 300’
100’
150’
80’
1816
700’
Truck Court
Industry Oaks Lane 100’
Greenway Access Area
740 780’
100’
110’
Merritt Capital Drive
741 730’
80’
120’
650’
Truck Court
150’
745 460’
120’
Unicon Drive
To Burlington
South Forest Industrial Park
Mills
PRE-LEASING AND BUILD-TO-SUIT OPTIONS
1800 INDUSTRY OAKS LANE
63,900 SF
1808 INDUSTRY OAKS LANE
72,000 SF
1816 INDUSTRY OAKS LANE
67,600 SF
BAY SIZE
BAY SIZE
BAY SIZE
1,350-3,150 SF
1,500-9,961 SF
2,400-3,150 SF
COLUMN SPACING
COLUMN SPACING
COLUMN SPACING
30’-35’
30’
30’-35’
EXTERIOR CONSTRUCTION
EXTERIOR CONSTRUCTION
EXTERIOR CONSTRUCTION
Concrete Tilt-Up
Concrete Tilt-Up
Concrete Tilt-Up
CEILING HEIGHT
CEILING HEIGHT
CEILING HEIGHT
18’ Clear
18’ Clear
18’ Clear
TRUCK COURT
TRUCK COURT
TRUCK COURT
108’
150’
150’
PARKING RATIO
PARKING RATIO
PARKING RATIO
+/- 2/1,000 SF
+/- 2/1,000 SF
+/- 2/1,000 SF
CMDA Heads (ESFR Ready)
CMDA Heads (ESFR Ready)
CMDA Heads (ESFR Ready)
SPRINKLER SYSTEM
SPRINKLER SYSTEM
SPRINKLER SYSTEM
DOCK-HIGH DOORS
DOCK-HIGH DOORS
DOCK-HIGH DOORS
17 (9x10)
17 (9x10)
23 (9x10)
12 (12’x14’) Grade Level Drive-In Available 480/208V 3-phase & 120/208V single phase power
14 (12’x14’) Grade Level Drive-In Available 480/208V 3-phase & 120/208V single phase power
DRIVE-IN DOORS
None
DRIVE-IN DOORS
DRIVE-IN DOORS
480/208V 3-phase power
POWER/ELECTRICAL
POWER/ELECTRICAL
POWER/ELECTRICAL
Made with FlippingBook flipbook maker